The energy grid will be brought online incrementally, starting in 2021, when battery production is scheduled to begin. Electrification and renewable energy storage are prerequisites for a carbon-neutral society. By building Europe's largest battery factory, Northvolt is helping to drive the energy transition to a carbon-neutral society. Initially, the factory will have a production capacity of 16 GWh per year.
ABB's delivery, which will ensure a stable and reliable power supply for the factory, includes project management, design, procurement of all third-party equipment, installation monitoring, and commissioning. The scope of supply includes transformers, circuit breakers, cables and installation materials, protection equipment, and control systems.
ABB had previously received several orders for power and automation supplies for Northvolt Labs' development and demonstration plant in Västerås. These deliveries included electrification, chemical process monitoring, the ABB Ability™ System 800xA control system, and control rooms with a state-of-the-art operator environment and ABB Ability™ Manufacturing Operations Management. Northvolt Labs began production in late 2019.
