The Sesma facilities primarily manufacture wind turbine converters, photovoltaic inverters, electric vehicle chargers, and converters for batteries and green hydrogen production via electrolyzers. The company has installed a 700 kW solar self-consumption system on the roofs of its buildings, which will allow it to supply more than 35% of its net daily energy needs with clean energy.

The celebration was attended by the president of Ingeteam, Teresa Madariaga; the CEO of Ingeteam, Adolfo Rebollo; along with other members of the board and directors of the company, as well as the President of the Foral Community of Navarra, María Chivite; the councilor of the Department of University, Innovation and Digital Transformation, Juan Cruz Cigudosa García and the mayor of Sesma Pedro Mangado, among other authorities.

Ingeteam's president, Teresa Madariaga, stated that “this factory is very important for Ingeteam, as it has been crucial to our growth, which is why we are continuing our commitment to this production plant. We are fully confident in the market success of the new technological developments we will manufacture in these new facilities.”
25 years exporting its products worldwide

The Sesma plant was inaugurated in August 1998 and employed 30 people. It was there that the first wind turbine converters were manufactured, which are still operating today at the El Perdón wind farm. Currently, with 57 GW of installed wind power capacity worldwide, Ingeteam is the world's leading independent supplier of wind turbine converters.
The same year the factory opened, production of its first photovoltaic inverters also began. For the solar sector, Ingeteam has supplied more than 28 GW for all types of photovoltaic installations, from residential to large multi-megawatt plants.
Later came energy storage associated with renewable technologies, which plays a key role in advancing the energy transition and the electrification of society. Its integration into the electrical system of the future will bring great advantages, such as making the use of available energy more flexible and optimized, improving the quality of supply, integrating energy generated with renewables and ensuring the stability and reliability of the grid.

In the last year, the addition of rectifiers for green hydrogen production to the plant is noteworthy. These rectifiers supply the direct current necessary for the electrolyzer to separate water molecules into hydrogen and oxygen. Power and control electronics for supplying electricity to the electrolyzer are therefore key aspects of green hydrogen production via electrolysis, as the electrolyzer's power supply has a significant impact on its efficiency and degradation.

New R&D Laboratory:
The company employs nearly 1,000 people in Navarre across its offices in Sarriguren, the power laboratory in Huarte, and the factory in Sesma. These facilities will be complemented by a new R&D laboratory in Sarriguren, whose construction will begin in early 2024, and which will be a benchmark for innovation in the sector.