Vidrala has carried out the technical and economic feasibility studies, urban planning, administrative, and environmental permitting, as well as the engineering project, with guidance from Norvento Enerxía. Construction work began during the first quarter of this year, with Norvento acting as project manager and Grupotec handling the installation and commissioning of the project, which will prevent the emission of approximately 9,000 tons of CO2 into the atmosphere annually.

The Crisnova plant was built by Vidrala in Caudete in 1989 and is currently one of the most important glass plants in Spain with a production of close to 900 million glass containers per year.